ISO 7 Clean Room Dry Room

Budget
$1.4M

Location
Stanford, CA

Duration
4 Months

Size
1,250 SF

Key Features

  • TEM preparation lab & MBE equipment support

  • New mechanical & process piping systems

  • Specialty gas systems & controls

  • New laboratory casework

  • Chemical fume hood installation

Overview

This project consisted of the abatement and demolition of two existing laboratory spaces, followed by a complete 1,250 SF laboratory buildout to support a new TEM preparation lab and MBE equipment. The project included the installation of all-new mechanical and process piping systems, specialty gases, controls, laboratory casework, and chemical fume hoods.

The buildout included the integration of the new laboratory systems and infrastructure required to support the TEM preparation lab and MBE equipment. Mechanical and process piping, specialty gas systems, controls, casework, and chemical fume hoods were incorporated throughout the newly constructed laboratory spaces.

With a project value of $1.4 million, the abatement, demolition, and complete laboratory buildout were completed over a four-month duration.