ISO 7 Clean Room Dry Room
Budget
$1.4M
Location
Stanford, CA
Duration
4 Months
Size
1,250 SF
Key Features
TEM preparation lab & MBE equipment support
New mechanical & process piping systems
Specialty gas systems & controls
New laboratory casework
Chemical fume hood installation
Overview
This project consisted of the abatement and demolition of two existing laboratory spaces, followed by a complete 1,250 SF laboratory buildout to support a new TEM preparation lab and MBE equipment. The project included the installation of all-new mechanical and process piping systems, specialty gases, controls, laboratory casework, and chemical fume hoods.
The buildout included the integration of the new laboratory systems and infrastructure required to support the TEM preparation lab and MBE equipment. Mechanical and process piping, specialty gas systems, controls, casework, and chemical fume hoods were incorporated throughout the newly constructed laboratory spaces.
With a project value of $1.4 million, the abatement, demolition, and complete laboratory buildout were completed over a four-month duration.